TRACK RECORD
2004 & 2005 Premuda - Monaco/Genoa/Australia
- Investigation into failed high-pressure product swivel stack
- Project management of the procurement of a new swivel stack
- Design of new swivel stack integration, revised process, hydraulic and electrical system
- Design and supply of new turret rotation system
- Supervision of installation and commissioning
EPPM - Tunisia
- Design review of the design and installation of 5 CALM buoys and their hoses, chains etc.
Oxxo - Ecuador
- Design of a 10m CALM buoy
SEREPT - Tunisia
- Inspection of the articulations between the SBS yoke and tanker
- Design, supply and installation supervision of new stainless steel shaft, polymeric bearing and associated items
- Design, supply and installation supervision of lifting gantry
- Design, supply and installation supervision of automatic greasing system for the articulations
Undisclosed Client
- Orcina analysis of buoy motions, and anchor chain system.
GIA - Mexico
- Supply of 2 Eagle Eye greasing systems for Pemex
Pre-2004 SBM Inc. - Monaco
- Design, supply and install three SPM main bearing and swivel automatic greasing systems, two for CPC, Taiwan and one for Chevron, offshore Angola. The first unit was installed on a new build buoy during construction, the second ashore during overhaul and the third offshore.
- Design and supply as standard equipment, main bearing GRP water protection assemblies on all new-build buoys. Ten units supplied to date. The first unit installed by our own engineers.
- Carry out study of CPC, Sha-Lung terminal and propose recommendations for upgrading operating procedures and equipment to operate safely, and cost effectively in heavy weather.
Reliance Petroleum Ltd. - India
- Develop and supply procedures and manuals for marine operations at Jamnagar. TMCO placed on site Port Captains, Pilots, Marine Pollution Experts, Marine Engineers and Diving Superintendents to quantify requirements, write procedures and manuals, train jetty staff and port operatives and carry out Pilot accreditation. Deliverables were the port information book, port documentation book, onshore and offshore operations, maintenance, tug and workboat maintenance, safety, training, oil spill response, significant incident and diving manuals. Performance indicators have been established and a benchmarking program established.
- Act as consultants in the development of a specification for the design and equipment list for an air dive support/maintenance vessel for the port of Jamnagar.
- Carry out audit of marine facilities at Hazira and produce recommendations for the safe and efficient operation of the port. Develop and produce the oil and chemical spillage response plan.
Environmental Resources Management - UK
- Research and produce a report on location, operating practices and design features of multiple SPM terminals in environmentally sensitive areas. This report was for BORL, part of the Marine Environment Study for the SPM/Subsea pipeline at Vadinar.
Vietsovpetro - Vietnam
- Design and supply two 8" product swivels.
- Supply FSO mooring system chains and shackles.
- Supply mooring hawsers and ancillary equipment for FSO tandem loading system.
- Design and supply materials for the local manufacture of chain tensioner for FSO moorings.
- Design and supply greasing systems for the mooring systems of two FSO's
- Supply unijoint components.
- Specify and Supply 5” mooring chain and shackles
- Supply main bearing bolts
Vinashin - Vietnam
- Act as adviser to State ship builders on design, build and installation of SPM for Vietnamese waters.
Marathon - Gabon
- Audit FSO and tanker offtake facilities and issue report containing recommendations for improvements in safety, operations, maintenance and training of personnel. Review equipment and procedures and make recommendations for increased performance.
Termap S.A. - Argentina
- Carry out feasibility study and produce calculations for the re-design of SPM chain mooring from a six leg to four leg configuration
Tesoro Pet. Corp, Hawaii
- Expert witness as operations & maintenance expert in SBM floating hose failure and pollution claim.
Glencore, London & Onyx Oil, Baar, Switzerland
- Expert in Time Charter disputes.
J.S. Webber Associates - UK
- Marine Consultants for the design of a proposed offshore taker discharge terminal in Eastern Europe.
Impac Offshore Engineering - Germany
- Partners in consortium to develop and propose a system concept for the offshore shi-to-ship loading of LNG for ExxonMobil.
Petrogal Portugal
- Perform detailed inspection of failed CALM buoy and hoses. Supervise model tests on revised system and assist client in defining a solution for a new offloading system.
- Expert Witness in arbitration case involving the suitability of a CALM buoy in heavy seas offshore Portugal.
Teeside Refinery, UK
- Expertise and assistance given to client in selection of a suitable offloading system.
Petroecuador, Ecuador
- Audit of the operations at the Balao Terminal and recommend upgrade procedures and training.
London Arbitration
- Appointed Arbitrator in Time Charter dispute.
Master Ropemakers, UK
- Manufacture & supply SPM hose handling equipment & hardware.
Ongoing in-house design and manufacture projects.
- Design mini diesel generator for battery charging on SPM's.
- Develop cost effective and reliable load monitoring system for SPM's.
- Develop improved SPM mooring hawser attachment systems.
Scanna Ramnas, Sweden
- Design and supply of chain-stoppers
|